  1. Symptoms

    On 12 February 2023, customers in Linode's US-West region could not reach their Linodes. Santa Clara customers lost Internet connectivity after a change made at 8:45 UTC until it was reverted at 10:13 UTC, and later in the day the connection between the Fremont and Santa Clara data centers was cut completely, leaving both with degraded service or a full outage until 16:25 UTC; customers could also have trouble provisioning, powering down or rebooting services.

    Trigger

    A single link of the A-side fibre circuit between Fremont and Santa Clara went down on 11 February, the whole B-side circuit followed on 12 February, and during troubleshooting with the hardware vendor a non-intrusive command triggered a rare bug that took down all A-side links.

    Root cause
    Component
    Contributing factor
    Detection

    The response team began investigating when the A-side link went down on 11 February. The status page opened at 10:22 UTC on 12 February to investigate reports of connectivity issues in the US-West region.

    Remediation
    • Reverted the change that removed internet traffic from the Santa Clara border routers
    • Performed an emergency code upgrade of both circuits, restoring connectivity between the sites
    • Restored the B-side path with the hardware vendor and fiber provider, regaining full redundancy
  2. Symptoms

    On Sunday 2 June 2019, with user impact beginning between 11:47 and 11:49 US/Pacific, Google Cloud projects in several US regions saw elevated packet loss from network congestion, and some regions became unreachable. Customers saw higher latency, intermittent errors and lost connectivity to instances in us-central1, us-east1, us-east4, us-west2, northamerica-northeast1 and southamerica-east1, while us-west1, Europe and Asia had no regional congestion.

    Trigger

    At 11:45 US/Pacific a relatively rare type of datacenter maintenance event started in one physical location, and the automation that runs it descheduled logical clusters that also held network control plane jobs in other physical locations.

    Root cause
    Component
    Contributing factor
    Detection

    Google engineers were alerted to the failure two minutes after it began and started the incident process used for the most serious production incidents. The first customer notice appeared on the status page at 12:53 US/Pacific.

    Remediation
    • Lowered the priority of less critical network traffic classes to reduce congestion
    • Halted the datacenter automation software responsible for the maintenance event
    • Rescheduled the network control plane and its supporting infrastructure in each location
    • Rebuilt and redistributed the lost network control plane configuration, rolling it out from 14:03
    • Directed service traffic away from the affected regions
    • Moved the Cloud VPN control plane in three regions out of its fail-safe state
    Action items
    • Keep the maintenance automation off until safeguards stop it descheduling jobs in several physical locations at once
    • Harden the cluster management software to reject such requests whatever their origin
    • Reconfigure the network control plane to reject maintenance requests of the type involved
    • Make the network control plane in each location persist its configuration
    • Let the network stay in fail static mode longer when the control plane is lost
    • Review, update and test emergency response tooling and procedures, including customer communication tooling, for such network failures
    • Extend continuous disaster recovery testing to this and similarly catastrophic failures
Check your cluster for this

These 2 cases involve Backbone network (WAN) and BGP routing. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause1