Cases2 cases
1 to 2 of 2
IL-0572About 10 million Pub/Sub messages backed up and Merpay accounting data was not written to Cloud Spanner for over a dayMercari2026- Symptoms
From about 6:00 on the last business day of a month, Cloud Pub/Sub messages of the Merpay accounting event pipeline began to back up, new accounting data stopped being registered in Cloud Spanner, and the accounting system intermittently could not accept new data. The backlog grew to about 10 million messages.
- Trigger
More than a month earlier the Cloud Functions of the pipeline had been moved from 1st gen to 2nd gen (based on Cloud Run) without setting --max-instances in the deploy command, which lowered the scale limit from effectively unlimited, the 1st gen default, to 100, the 2nd gen default. The month-end peak, which on that day continued for about 40 minutes, reached that limit.
- Root cause
- Component
- Contributing factor
- Remediation
- Re-ingested the messages saved to GCS by the Dataflow subscription, avoiding data loss
- Action items
- Set max-instances and the other scaling parameters of Cloud Run explicitly in the deploy definition, raising max-instances from 100 to 1000 in steps
- Set min-instances to 1 to avoid cold starts, raise concurrency from 1 to 10, and set CPU to 1 and memory from 512MB to 1Gi
- Use the dual CPU scaling mode of spanner-autoscaler v0.8.0 with a new Total CPU threshold of 70%
- Lower the High priority CPU threshold from 60% to 55% so scale-up starts earlier
- Forbid Spanner scale-down between 5:00 and 7:00
- Reserve Spanner processing units on a schedule for periods with predictable load
- Alert in Datadog when the Cloud Run instance count reaches 40% and 60% of its limit
- Alert in Datadog when undelivered Pub/Sub messages exceed a threshold, lowering it step by step
- Lessons
When moving to a new generation of a managed service, defaults that the team never changed can surface as problems under load, so parameters that only matter at peak, such as scale limits, concurrency and timeouts, should be set explicitly at every migration. An outage rarely has one cause; the fact that the previous month passed under the same conditions pointed to traffic continuity, and prevention needs to look at the trigger, the amplification and what turned it into damage. Capacity settings and the monitoring that shows when they are approached have to be designed together, and teams that run systems they inherited should review these settings and assumptions regularly.
IL-0316Railway's control plane slowed and deployments stopped after a PgBouncer version jump used abnormal CPU and memoryRailway2025- Symptoms
At 11:48 UTC on 22 September 2025, minutes after Railway had resolved a dashboard outage, its control plane showed abnormal resource consumption and elevated API latency. A large backlog of deployments queued during the first outage had started all at once, and the control plane began returning elevated database errors.
- Trigger
After a dashboard outage caused by a schema change was fixed, a large backlog of queued deployments started at the same time and put the control plane and its database, behind a newly upgraded PgBouncer, under heavy load.
- Root cause
- Component
- Contributing factor
- Detection
Users reported at 11:05 UTC that the project canvas failed to load; the control plane's abnormal resource consumption and elevated API latency were seen at 11:48 UTC and opened as a new incident.
- Remediation
- Deployed a fix for the API failure caused by the schema change within 15 minutes
- Suspended deployments for non-Pro users so Pro users could deploy and the queue could drain
- Suspended all deployments, Pro included, for up to 20 minutes during peak instability
- Scaled up the control plane database's CPU, memory, connection limits and IOPS
- Rolled PgBouncer back to the previous stable version, which brought all metrics back to nominal
- Re-enabled deployments for all non-Pro users
- Fixed the edge case in which private networks and their endpoints were missing from the dashboard
- Action items
- Re-engineer parts of the control plane to be more resilient, moving large parts of its storage layer away from Postgres
- Add CI validation that keeps disruptive schema changes out of production and automated schema compatibility checks before backend deployments
- Monitor and alert on PgBouncer node CPU, memory and connection pool utilization
- Upgrade PgBouncer in phases, instance by instance, instead of everywhere at once
- Lessons
Railway believes that without the breaking schema change reaching production the cascade would not have happened, that monitoring PgBouncer's own CPU, memory and pool metrics would have shown the performance regression earlier and shortened recovery, and that upgrading PgBouncer instances one at a time would have exposed the version-specific problem before it reached every instance.
These 2 cases involve Database and Database proxy and connection pooler. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.
By root cause1
Breaking change in an upgrade2 cases
- Contributing factor