  1. Symptoms

    On 25 March 2026 from about 16:40, public sector organisations on the PSBA network across Wales lost connectivity at their sites. The Service Desk saw about 400 alerts at 16:58, when a Major Incident was declared, about 1,500 at 17:05 and about 5,000 across Wales at 17:08, while councils, a fire and rescue service and Natural Resources Wales phoned in to report sites down.

    Trigger

    At 16:30 a route map change was applied, outside formal change control, on a PSBA core Provider Edge (PE) router to leak MPLS VPN routes, so that legacy Capita-operated UPS devices in a /16 subnet could be managed by BT/PSBA. The change was removed at 16:40.

    Root cause
    Component
    Contributing factor
    Detection

    At 16:57 Mid Wales Fire & Rescue Service phoned in a loss of connectivity at its Presteigne site, and at 16:58 a case was opened in Service Now for a group of about 400 alerts and a Major Incident was declared.

    Remediation
    • Removed the route map change from the PE router at 16:40
    • Changed QoS on the BGP to bring back the management links, after which alarms cleared
    • Cleared routes and reset inbound BGP advertisements, which did not stop the default route being advertised
    • Corrected the configuration issue affecting the internet learned route at 01:02
    • Performed a controlled reload of the affected router at 01:10, which restored customer services and management connectivity
    Action items
    • Reinforce change control requirements with an internal briefing on formal change submission, the risks of unplanned changes and roles during planned and emergency changes
    • Create a dedicated Microsoft Teams channel as the single real-time communication point for all live P1 and Major Incidents
    • Explore disaster recovery and business continuity test exercises for major or P1 incidents
    • During loss of management access, have all technical teams assess customer impact from what reporting organisations provide, captured and shared in real time by the Service Desk and Incident Management
    • Investigate a fixed link between Capital Quarter and the PSBA management racks in Vantage Data Centre at Newport, with dedicated management terminals and two-factor authentication for access outside the secure management platform
    • Improve initial triage with stronger probing questions when incidents are reported and keep reassessing and communicating impact throughout the incident
    • Review the P1 and Major Incident process so escalation criteria and timeframes are clearly defined, and train the Service Desk to recognise and escalate them early
    • Review the PSBA estate for legacy configuration, set processes and timeframes for removing it and add controls so it is not introduced again
    • Review email and SMS distribution lists and processes and reinforce Service Desk training on customer communications during P1 and Major Incidents
    Lessons

    The report names eight lessons: a change was made outside PSBA change control; internal communication during the Major Incident was slow and fragmented; the organisation was not ready for a network-wide incident; losing management access stopped the resolver groups from seeing the network state and customer impact; the resolver groups did not understand customer impact in enough detail, which delayed finding the root cause; escalation to PSBA management was slow; legacy configuration left in the network contributed; and email and SMS communications did not reach some customers in time.

  2. Symptoms

    From 06:00 UTC on 10 June 2025, Heroku services degraded badly: customers reported intermittent logins, applications failed, and Heroku's monitoring detected widespread errors with dyno networking. Heroku's own tools and the Heroku Status Page were affected as well, which delayed communication with customers and left many of them without accurate status updates. Only at 13:58 UTC did the team find a workaround to post updates to the @herokustatus account on X.

    Trigger

    An automated operating system update ran on Heroku's production infrastructure when it should have been disabled, and it restarted the hosts' networking services.

    Root cause
    Component
    Contributing factor
    Detection

    Customers reported intermittent logins, and Heroku's monitoring detected widespread errors with dyno networking. Heroku's own tools and the Heroku Status Page were affected as well.

    Remediation
    • Restarted internal instances in rotation, which gave some relief
    • Had an upstream vendor invalidate the token used for the automated updates
    • Disabled the automated upgrade service
    • Recycled dynos across the whole fleet
    Action items
    • Put permanent controls in place so no system change happens outside the controlled deployment process
    • Audit all base images for similar risks
    • Make network routing survive graceful restarts of the networking service
    • Build fully independent backup communication channels
    • Overhaul incident response tooling, including tools that run queries across the whole fleet
    • Streamline break-glass procedures for rapid access to critical systems
    • Improve monitoring to detect complex issues earlier
    Lessons

    Heroku's post-mortem names three areas: production lacked immutability controls, so an automated process could change it; communication was too slow, made worse by a status page that went down with the platform; and gaps in tooling and process made recovery take longer than it should have.

  3. Symptoms

    At about 06:00 UTC on 10 January 2024, SourceHut's monitoring raised the alarm as a layer 3 DDoS attack hit its infrastructure in the PHL datacenter, and at about 09:00 UTC SourceHut lost all access to its PHL network. PHL was the primary datacenter, and the network became unreachable for SourceHut staff and the general public alike.

    Trigger

    A layer 3 DDoS attack against SourceHut's PHL infrastructure that began at about 06:00 UTC on 10 January 2024 and broadened to more of the PHL subnet on 11 January.

    Root cause
    Component
    Contributing factor
    Detection

    SourceHut's monitoring systems noticed that something was wrong and raised the alarm from about 06:00 UTC on 10 January.

    Remediation
    • Got Cogent, through the colocation provider, to narrow the null route from the /24 to the targeted /32, which mostly restored service on 10 January
    • Moved DNS to an external DNS provider
    • Brought up a new primary database in AMS
    • Restored backups from FRE to AMS
    • Applied the difference between production data and the last backups by hand
    • Provisioned a new mail system and configured the mail services for it
    • Set up an OVH box that NATs traffic through OVH's DDoS-resistant network to the production subnet in AMS
    • Used a temporary subnet from the PHL network provider for out-of-band access to the PHL servers
    • Served pages.sr.ht through an out-of-band link to PHL while its object storage was migrated
    • Emailed pages.sr.ht users whose apex records pointed at the PHL subnet with instructions
    • Ran build workers on dedicated bare-metal OVH servers
    Action items
    • Provision a new standby database
    • Configure backups from AMS to FRE
    • Install a new monitoring system
    • Retire the PHL datacenter installation and ship its servers to AMS
    • Move build service back onto SourceHut-operated servers once the build servers are shipped from PHL to AMS
    • Research and implement a way to run SourceHut in an on-premise Kubernetes cluster
    • Plan a second production-ready datacenter to load balance against, able to take over full service in a datacenter outage
    Lessons

    The operational plans SourceHut kept for failures up to the loss of a whole datacenter proved important in this incident. The incident exposed a known shortcoming in redundancy and resilience that the team was working on but had not finished, and the response of the upstream network to the attack did more damage than anything else.

  4. Symptoms

    From 20:18 UTC on 11 June 2022, OpenStreetMap.org was unavailable: all of its services hosted in Amsterdam, including www, the API, the wiki and planet, had no connectivity to the Internet. The outage began 18 minutes into Equinix's planned maintenance of power feed A at the Amsterdam data centre.

    Trigger

    Equinix's planned 5-year maintenance of power feed A in Amsterdam, which started at 20:00 UTC on 11 June 2022.

    Root cause
    Component
    Contributing factor
    Remediation
    • Waited for the end of the Equinix power feed A maintenance window instead of failing over to Dublin or moving the uplink; connectivity returned at 03:45 UTC
    Action items
    • Acknowledge ongoing outages faster
    • Add monitoring and alerting of switch PSU and FAN states
    • Replace the Cisco SG550X-48 switches and the Redundant Power System with Juniper EX4300 switches with redundant power supplies
    • Install out-of-band access equipment with dual power feeds in Amsterdam
    • Install redundant uplinks
    • Make site failover easier, less manual and lower risk
    • Introduce an on-call pager system for the operations SRE
    • Expand the SRE team
    • Continue and formalise fail-over tests for power, network, upstream link and service outages
  5. Symptoms

    On 4 October 2021 Facebook's platforms went down worldwide: every connection in Facebook's global backbone network was lost, and the data centers were cut off from each other and from the internet. The rest of the internet could no longer find Facebook's servers, because Facebook's authoritative DNS servers had become unreachable.

    Trigger

    During routine maintenance of the backbone, a command was issued to assess the availability of global backbone capacity, and it unintentionally took down all connections in the backbone network.

    Root cause
    Component
    Contributing factor
    Remediation
    • Sent engineers onsite to the data centers to debug the issue and restart systems
    • Brought the backbone network back online across the data center regions
    • Brought services back gradually, managing the rising load to avoid crashes from a traffic surge
    Action items
    • Find ways to simulate the global backbone being taken offline in storm drills
    • Strengthen testing, drills and overall resilience
    Lessons

    The hardening that protects Facebook's data centers against unauthorized access slowed recovery from an outage caused by Facebook's own error, and the author judges that tradeoff worth keeping. Storm drills prepared the teams to bring load back safely, although no drill had yet simulated the global backbone going offline.

Check your cluster for this

These 9 cases involve BGP routing and Backbone network (WAN). kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause7

Configuration change1 case

Component
Organisation
  1. IL-0400 Public sector sites across Wales lost connectivity for over 8 hours as a PE router wrongly advertised a default route
    PSBA2026

Breaking change in an upgrade1 case

Organisation
  1. IL-0227 Most Heroku dynos in Private Spaces lost outbound connectivity after an automated OS update restarted host networking
    Heroku2025

Dependency failure2 cases

  1. IL-0509 SourceHut was down for 170 hours after a DDoS led its upstream network to null-route the PHL datacenter's subnet
  2. IL-0258 FastMail was unreachable for almost two hours when the GRE tunnels carrying its traffic from Level 3 went down

Hardware failure1 case

  1. IL-0525 OpenStreetMap.org went offline for 7h 27m when its uplink switch lost power during a data-centre power feed maintenance

Operator error1 case

Organisation
  1. IL-0221 A backbone maintenance command disconnected all Facebook data centers, and its DNS servers withdrew their BGP routes
    Meta2021

Software defect1 case

Organisation
  1. IL-0222 Google Cloud US regions had heavy packet loss and some went unreachable after the network control plane was descheduled

Cloud provider outage2 cases

Organisation
  1. IL-0261 Discord went fully offline twice as short network losses on Google Cloud sessions nodes wedged Erlang distribution
  2. IL-0494 Netlify's central load balancer IP stopped responding when Rackspace null-routed it in a DDoS, and A-record sites hung