Incident Library
Applied filters ComponentGKE control planeSymptomService outageClear allEvery case under the filters, with no sentence; newest first.
Suggested filters Search, and the values found in your words appear here.

Graph

  • Root cause
  • Component
  • Symptom
  • Contributing factor
  • Case

Cases5 cases

1 to 5 of 5

  1. Symptoms

    Nodes that already existed kept running, but every new node, spot or standard, on either v1.32 or v1.33, failed to initialise and could not join the cluster. Spot nodes that were preempted and recreated never came back, so services degraded progressively: background workers on spot instances, reporting services and order allocation stopped completely, and the APIs on existing nodes kept answering but could not scale for load spikes.

    Trigger

    Google upgraded the GKE control plane from v1.32.x to v1.33.2 at the version deprecation deadline, although auto-upgrade was disabled on the node pools.

    Root cause
    Component
    Contributing factor
    Remediation
    • Created a new GKE cluster at v1.33, the version of the forced upgrade
    • Upgraded Istio to 1.27.1 for Kubernetes 1.33 compatibility
    • Updated the cert-manager configuration for Kubernetes 1.33
    • Migrated all production workloads to the new cluster and verified pod scheduling, DNS resolution, PVC mounting and external integrations
    • Decommissioned the broken cluster
    Action items
    • Configure all clusters to use the GKE stable release channel
    • Implement a separate management cluster for Argo CD, monitoring and other control components (Q4 2025)
    • Review spot instance usage for critical workloads and add on-demand fallback pools
    • Document the SRE upgrade procedure: management cluster first, production after a monitoring period of several days
    • Document a Kubernetes, Istio and cert-manager compatibility matrix
    • Create an automated upgrade testing pipeline
    • Reserve static IPs for quick migrations
    • Pin versions of Istio, cert-manager, CSI and DNS addons
    • Stay current with stable releases and regularly check GKE alerts and announcements to avoid deprecation deadlines
    Lessons

    GKE upgrades the control plane at a version's deprecation deadline even when auto-upgrade is disabled, so staying inside the supported version window is how to avoid a forced upgrade. A control plane upgrade can leave existing nodes healthy while every new node fails, and spot nodes that cannot rejoin after preemption turn this into cascading failures. Relying heavily on spot instances for critical workers turned a node join failure into a progressive outage. Kubernetes upgrades have to be planned together with dependent components such as Istio and cert-manager, and without a standby cluster on the same provider there was no immediate failover; the only recovery left was building a new cluster.

  2. Symptoms

    On 2023-05-18 a Slack alert arrived at 20:01 and Istio stopped working properly in the production GKE cluster. The istiod error logs said that the v1beta1.Ingress and v1beta1.ValidatingWebhookConfiguration resources could not be found.

    Trigger

    GKE automatically upgraded the production cluster's control plane from 1.22.17-gke.7500 to 1.23.17-gke.1700 at 19:52 on 2023-05-18.

    Root cause
    Component
    Contributing factor
    Detection

    A Slack alert at 20:01 on 2023-05-18, nine minutes after the control plane upgrade. The istiod error logs showed that the v1beta1 Ingress and ValidatingWebhookConfiguration resources could not be found.

    Remediation
    • upgraded Istio from 1.7.4 to 1.13.3
    Lessons

    The first diagnosis, end of support for Istio, was wrong; the real cause was found by matching the alert time against the cluster's UPGRADE_MASTER operations in Logs Explorer. The author recommends checking the version compatibility matrices of Kubernetes, Istio and other packages, keeping a production version for at least six months and upgrading three months before end of support, keeping the test environment on the latest version, backing up before upgrades, managing deployments and versions with a tool such as Argo CD, and testing upgrades in a test environment before production.

  3. Symptoms

    At 12:00 EST the health check system reported that the backend APIs, the frontend and the tunnels in the EU region were down. The team first took it for a transient error, such as an interrupted client request or a server evicted for memory or CPU pressure, but the main dashboard was offline as well.

    Root cause
    Component
    Contributing factor
    Detection

    The health check system sent a notification that the service was down; the team then found the main dashboard offline.

    Remediation
    • recreated the node pools by hand after the credential rotation failed to recreate them
    • duplicated the main cluster's services into a newly created GKE cluster
    • deleted the Kubernetes Service records in the old cluster so its load balancers could be attached to the new cluster
    • detached the StatefulSet from the old cluster and switched all writes to the main disk
    • exported the data from the temporary ClickHouse instance and inserted it into the main instance
    Action items
    • Change the deployment manifests so services can be switched between clusters quickly without a complicated persistent disk migration
    Lessons

    Recovery of existing infrastructure needs a time limit. Throughout the outage the old cluster looked about to recover, and the reluctance to give up on the salvage effort kept the team from starting over with a new cluster much sooner, which would have been the right call. On older GKE clusters, check the validity of the cluster CA certificate, for example by decoding masterAuth.clusterCaCertificate from gcloud container clusters describe and reading it with openssl x509. GKE's multiple availability zones made no difference in this failure.

  4. Symptoms

    Jetstack was upgrading the master of a development cluster that many teams use to test their apps during the working day, a regional Google Kubernetes Engine (GKE) cluster in europe-west1. The upgrade ran through Jetstack's GKE Terraform pipeline and did not finish before the 20-minute Terraform timeout, while the GKE console still showed the cluster as upgrading.

    Trigger

    A planned master upgrade of the shared development cluster. The same upgrade had been done on another pre-production environment earlier that day, and no API downtime was expected.

    Root cause
    Component
    Contributing factor
    Detection

    The first sign was the master upgrade missing the 20-minute Terraform timeout; re-running the pipeline returned the kube-apiserver unhealthy error. The cause was identified with the help of Google Support.

    Remediation
    • Deleted the OPA ValidatingAdmissionWebhook resource during a window of API server access
    Action items
    • Limit the OPA webhook to the namespaces where the policy applies and development teams have access
    • Enable the webhook only for Ingress and Service resources, the only resources the policy validates
    • Add a liveness probe so OPA is restarted when it stops responding, and update the OPA documentation
    • Follow the open upstream Kubernetes issue about this behaviour
    Lessons

    With alerting on API server response times, the team might have seen CREATE and UPDATE requests slow down across the board as soon as the OPA-backed webhook was first deployed. Every workload needs probes: OPA looked so simple to deploy that the team skipped the Helm chart, which adds a livenessProbe for the admission controller containers among other adjustments to the tutorial configuration. Others had hit the same problem, and an upstream issue to improve it was still open.

  5. Symptoms

    On the evening of a long-overdue upgrade of a loveholidays production GKE cluster from 1.10.X to 1.12.5-gke.10, planned to take 2 to 2.5 hours, the master upgrade and the first two 7-node NodePools went smoothly. After that the NodePool upgrades slowed to a crawl. Each node is cordoned, drained and upgraded in turn. Even a 14-node cluster at about 5 minutes per node took over an hour, and with about 100 more nodes to go, some of them taking over 15 minutes to drain, the sequential drains were too slow to finish at a reasonable hour.

    Trigger

    A manual upgrade of the GKE masters and NodePools from 1.10.X to 1.12.5-gke.10, two versions at once, on 19 March 2019; GKE's release notes of 14 March had already said that version was no longer available for new clusters or master upgrades because masters showed elevated error rates, but it could still be selected.

    Root cause
    Component
    Contributing factor
    Detection

    The slow drains, zombie nodes and stuck NodePool were seen by the engineer running the upgrade; the broken Ingress was noticed after the upgrade and explained by Google support; the HPA problem was noticed the next day.

    Remediation
    • drained the remaining NodePool nodes ahead of the upgrade with kubectl drain --ignore-daemonsets --delete-local-data
    • deleted the zombie instances from the managed instance group with gcloud compute instance-groups managed delete-instances
    • cancelled the stuck UPGRADE_NODES operation with gcloud beta container operations cancel
    • used kubectl port-forward in place of the broken internal Ingresses
    • scaled down the older of two active ReplicaSets, or triggered a dummy deployment, to bring the HPA back
    Action items
    • Alert when a HorizontalPodAutoscaler is at 70% and at 100% of its capacity
    • Alert when a deployment has had two active ReplicaSets for 30 minutes and for 60 minutes
    • Re-evaluate termination grace periods that were set to arbitrary large values
    • Read the GKE release notes before every cluster upgrade
    • Use auto-upgrade in non-production environments, and manual cluster upgrades with automatic node upgrades in production
    • Keep environments as identical as possible, including resource names
    Lessons

    Read the release notes before upgrading: the target version had been withdrawn five days earlier. Drain time depends on pod configuration, so emptyDir volumes, long grace periods and missing disruption budgets turn a NodePool upgrade into hours. Pre-production only catches problems like the ingress bug if it matches production down to resource names. Auto-upgrades in non-production surface problems early, and a mix of manual cluster upgrades and automatic node upgrades in production keeps clusters current without much effort.

Check your cluster for this

These 5 cases involve GKE control plane and Node pool. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause4

Breaking change in an upgrade2 cases

  1. IL-0101 After Google forced a GKE control plane upgrade to 1.33.2 at a deprecation deadline, no new node could initialise, so autoscaling and spot node replacement stopped for 15 hours
  2. IL-0180 A GKE control plane auto-upgrade from 1.22 to 1.23 removed the v1beta1 Ingress and ValidatingWebhookConfiguration APIs that Istio 1.7.4 still used, and Istio stopped working in production

Certificate or credential expiry1 case

Organisation
  1. IL-0113 The managed GKE control plane of Webhook Relay's main cluster failed because its API server certificates had never been rotated, and a manual credential rotation reported success without taking effect

Configuration change1 case

Organisation
  1. IL-0008 An unresponsive OPA validating webhook crash-looped the API server during a GKE master upgrade, and node auto-repair then recreated every node

Cloud provider outage1 case

Organisation
  1. IL-0014 A GKE upgrade to a withdrawn version stalled on slow drains and a stuck node pool, then broke an ingress and confused the HPA