Incident Library
Applied filters Root causeDependency failureComponentInfiniBand fabricFactorNo runbookClear allEvery case under the filters, with no sentence; newest first.
Suggested filters Search, and the values found in your words appear here.

Graph

  • Root cause
  • Component
  • Symptom
  • Contributing factor
  • Case

Cases2 cases

1 to 2 of 2

  1. Symptoms

    On 19 August 2026 the first equipment-level signs in Nebius's us-central1 region appeared around 09:40 UTC: the InfiniBand fabric degraded and GPU over-temperature alerts began to accumulate. Customer reports followed shortly after 10:00. At 10:15 on-call engineers were paged on critical component temperature alerts, and the incident was declared at 10:21.

    Trigger

    A storm-related event at the data center building took the building management system offline and shut down the chilled-water cooling loop.

    Root cause
    Component
    Contributing factor
    Detection

    No facility-level alert fired, because the storm also disabled the building management system that monitors the facility. Engineers acted on component over-temperature alerts that paged on-call at 10:15 UTC, after InfiniBand degradation, GPU over-temperature alerts and customer reports; the temperature rise from about 09:15 was visible on dashboards but had no alert.

    Remediation
    • had the facility operator switch cooling to manual bypass mode and opened rack rear doors to vent heat
    • re-energised tripped racks, control-plane racks first
    • restored the regional infrastructure control plane by manual intervention
    • restarted block-storage host components to clear stale disk attachment state
    • raised the VM recovery rate limits by hand for the region-scale recovery
    • started the affected Managed Kubernetes control-plane instances by hand
    • applied a controlled stop and start to control-plane instances whose data disk had been left unattached
    • identified and started 104 customer VMs that the incident had stopped
    Action items
    • Complete a joint resilience review with the facility operator covering redundancy of facility-management and monitoring systems, cooling that keeps running when those fail, electrical protection of cooling equipment and on-site response
    • Add facility-level environmental alerting on cooling plant state and room temperature trend that pages on-call independently of the building management system
    • Set up a documented emergency escalation path with the facility operator, with an on-call contact tree and guaranteed response times
    • Define an emergency heat-load reduction procedure with criteria, ownership and mechanics for shutting down or degrading workloads during a cooling loss
    • Establish a dependency-ordered region cold-start procedure with clear ownership for each service layer
    • Run regular region-scale recovery drills that cover VMs, storage attachments and Managed Kubernetes clusters
    • Fix the disk-attachment bug that extended the Managed Kubernetes outage and deploy the fix to all production regions
    • Improve the recovery policies Compute users can configure, and move all Managed Kubernetes control-plane nodes to the improved policy
    • Automate reconciliation of stale storage attachment state after abrupt host failures
    • Remove in-region dependencies from monitoring startup and recovery, and extend cross-region monitoring
    • Make regional health checks used for global traffic management reflect real service availability
    Lessons

    Facility monitoring that runs on the same system it watches goes silent in exactly the failure it should report, and with no alert on the room temperature trend there was no practical window to shed heat load in a controlled way. A cold start of a whole region exercised recovery paths built for isolated failures: single-attempt VM recovery, conservative rate limits and stale disk attachments all needed manual work. The longest part of the outage was restoring customer resources, Managed Kubernetes control planes above all, so Nebius is extending its recovery drills to that layer.

  2. Symptoms

    Between the team's 17 November 2021 update and 3 December 2021, the 175B-parameter OPT training run went down and had to be restarted more than 40 times, for hardware, infrastructure and training stability reasons. A hardware fault could stop the run for hours at any time of day, and several did over the Thanksgiving break.

    Trigger

    Nodes in the cloud training cluster failed with ECC errors, and each failure took the training run down.

    Root cause
    Component
    Contributing factor
    Detection

    During these two weeks the team added monitoring of train.log, GPU burn-in testing to detect memory errors, and automated InfiniBand testing.

    Remediation
    • replaced failed nodes, and later did it through a script
    • added GPU burn-in testing to detect memory errors
    • automated InfiniBand testing
    • added monitoring of train.log
    • debugged the cloud provider's Python API until checkpoint downloads from the blob store worked well enough
    Action items
    • Run an on-call rotation for the training run, with runbooks and tooling for the most common issues, and invite more people to join it
    Lessons

    At this scale cloud hardware failures are certain, and the team concluded that automating the handling of hardware failures is necessary. Without spare nodes and burn-in tests, each failure costs hours and a replacement can bring the same fault back. The team also concluded that cloud infrastructure instability is something to always prepare for, because the customer has no control over the underlying hardware. A checkpoint large enough to need hundreds of multi-gigabyte downloads makes the storage path part of recovery time.

Check your cluster for this

These 2 cases involve InfiniBand fabric and Cloud block storage. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause1