  1. Symptoms

    On 18 October 2024, from 7:50 to 8:01 UTC, about 25% of the hypervisors in Scaleway's FR-PAR-1 availability zone lost VPC connectivity with the rest of the region, and products that use VPC failed with them. Public internet connectivity and Elastic Metal VPC connectivity were not affected.

    Trigger

    At 6:20 UTC a Top of Rack switch in FR-PAR-1 had a software crash. One of the two BGP route reflectors for VPC ran on a hypervisor in that rack and was left in an abnormal state.

    Root cause
    Component
    Contributing factor
    Detection

    Health-check monitoring on both route reflectors detected the anomaly, and the Scaleway Customer Excellence and SRE teams detected the customer impact and opened an incident.

    Remediation
    • Fixed both VPC route reflectors by manual action
    Action items
    • Fixed the autohealing mechanism that had failed to fix route reflectors stuck in a stale state; the fix is https://github.com/FRRouting/frr/pull/17163
    • Run different software versions on the route reflectors so a single bug cannot stop several instances
    • Investigate the software issue that left the route reflectors in a stale state
  2. Symptoms

    From 15:22 US/Pacific on 16 May 2024, new VMs and other new instances across Google Cloud came up without network programming, so the new instances could not open network connections, and VMs that were migrated or restarted lost connectivity. Changes to virtual network configuration, such as firewall rules and load balancers, were not applied. Internal monitoring alerted Google engineers at 15:41.

    Trigger

    Google's infrastructure team ran a routine maintenance action meant to shut down one unused VPC Controller in a single Google Cloud zone, and the automation shut down VPC controllers in all zones where the controllers were still in use.

    Root cause
    Component
    Contributing factor
    Detection

    Internal monitoring alerts reached Google engineers at 15:41 US/Pacific, and the investigation started immediately.

    Remediation
    • Paused maintenance operations to prevent the shutdown from repeating
    • Brought the affected VPC Controllers back into a serving state in every zone
    • Stopped the automation responsible for the shutdown until safeguards are in place
    • Recovered partial Apigee proxy deployments by hand
    • Cleaned up VMs left behind by failed Dataproc cluster deletions
    Action items
    • Add safety measures that check that maintenance operations carry correctly scoped zone information
    • Make the underlying tools reject maintenance operations that do not specify zones
    • Tighten on-demand access control so one maintenance invocation cannot work across multiple zones
    • Add safety checks, testing and validation for maintenance operations, including positive and negative test cases for the new safety measures
  3. Symptoms

    On Sunday 2 June 2019, with user impact beginning between 11:47 and 11:49 US/Pacific, Google Cloud projects in several US regions saw elevated packet loss from network congestion, and some regions became unreachable. Customers saw higher latency, intermittent errors and lost connectivity to instances in us-central1, us-east1, us-east4, us-west2, northamerica-northeast1 and southamerica-east1, while us-west1, Europe and Asia had no regional congestion.

    Trigger

    At 11:45 US/Pacific a relatively rare type of datacenter maintenance event started in one physical location, and the automation that runs it descheduled logical clusters that also held network control plane jobs in other physical locations.

    Root cause
    Component
    Contributing factor
    Detection

    Google engineers were alerted to the failure two minutes after it began and started the incident process used for the most serious production incidents. The first customer notice appeared on the status page at 12:53 US/Pacific.

    Remediation
    • Lowered the priority of less critical network traffic classes to reduce congestion
    • Halted the datacenter automation software responsible for the maintenance event
    • Rescheduled the network control plane and its supporting infrastructure in each location
    • Rebuilt and redistributed the lost network control plane configuration, rolling it out from 14:03
    • Directed service traffic away from the affected regions
    • Moved the Cloud VPN control plane in three regions out of its fail-safe state
    Action items
    • Keep the maintenance automation off until safeguards stop it descheduling jobs in several physical locations at once
    • Harden the cluster management software to reject such requests whatever their origin
    • Reconfigure the network control plane to reject maintenance requests of the type involved
    • Make the network control plane in each location persist its configuration
    • Let the network stay in fail static mode longer when the control plane is lost
    • Review, update and test emergency response tooling and procedures, including customer communication tooling, for such network failures
    • Extend continuous disaster recovery testing to this and similarly catastrophic failures
  4. Symptoms

    On 30 January 2017, Google Compute Engine instances, Cloud VPN tunnels and GCE network load balancers that were created or live migrated between 10:36 and 12:42 PDT could not be reached on their public IP addresses. Resources created earlier, and instances that were not live migrated, kept working.

    Trigger

    A large set of updates was applied to a rarely used load balancing configuration on the shared layer 2 load balancers.

    Root cause
    Component
    Contributing factor
    Remediation
    • Restarted the jobs that program changes into the network load balancers, so the stuck changes were processed as a batch
    • Applied the fix zone by zone between 11:36 and 12:42
    Action items
    • Increase the canary timeout so updates that hit the inefficient code path only slow network changes instead of stopping them
    • Improve the inefficient code path
    • Write new tests that check behaviour on a wider range of configurations
    • Accelerate replacing global propagation of address configuration with decentralized routing
    • Add metrics and alerting that identify this kind of issue sooner
Check your cluster for this

These 4 cases involve Network control plane (SDN) and BGP routing. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause1