Incident Library
Applied filters Root causeDependency failureSymptomContainer crash loopFactorUnreviewed defaultsClear allEvery case under the filters, with no sentence; newest first.
Suggested filters Search, and the values found in your words appear here.

Graph

  • Root cause
  • Component
  • Symptom
  • Contributing factor
  • Case

Cases2 cases

1 to 2 of 2

  1. Symptoms

    While the Spring Cloud Config Server was briefly down for an upgrade, every client application began to answer its liveness probe with a failure saying it could not reach the config server.

    Trigger

    A downtime upgrade of the Spring Cloud Config Server made it stop responding for a short time.

    Root cause
    Component
    Contributing factor
    Lessons

    A liveness probe that includes an external dependency turns a short outage of that dependency into a restart loop of every client. Keep external dependencies out of liveness checks and handle temporary problems with readiness probes. Libraries can add health indicators to Spring Boot's actuator health endpoint automatically, so check what the probe path actually reports. The author ran another Kubernetes environment for two years without liveness probes, relying on strict readiness probes and on the application terminating itself on unrecoverable faults.

  2. Symptoms

    While the customer was updating the AMIs of its Amazon EKS nodes across more than 30 clusters running Istio, sidecar-injected workloads in one cluster failed to start and showed CrashLoopBackOff.

    Trigger

    Updating the EKS node AMIs, which started hundreds of sidecar-injected pods at the same time.

    Root cause
    Component
    Contributing factor
    Detection

    Sidecar-injected workloads in the updated cluster failed to start and showed CrashLoopBackOff; the customer raised a Severity 1 ticket and a Tetrate engineer was reviewing logs within six minutes.

    Remediation
    • scaled istiod down temporarily from 40 replicas to 1 to slow Istio's internal processes and ease the load on the CA
    • deleted the CertificateSigningRequests stuck in the Approved, Failed state
    • restarted the pods gradually in a controlled order instead of all at once
    Lessons

    When a mesh hands certificate signing to an external CA, every pod start becomes a signing request to that CA, so a mass restart such as a node image rollout can overload it. Sidecars then abort under istiod's 10-second default CA timeout even though the CSRs are eventually signed. Restarting pods in controlled batches keeps the request rate within what the CA can handle. The author's point is that diagnosing such a failure means looking at the whole service mesh ecosystem, including its external dependencies, not only Istio.

Check your cluster for this

These 2 cases involve Admission webhook and Liveness and readiness probes. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause1