Cases3 cases

1 to 3 of 3

  1. Symptoms

    On 25 March 2026 from about 16:40, public sector organisations on the PSBA network across Wales lost connectivity at their sites. The Service Desk saw about 400 alerts at 16:58, when a Major Incident was declared, about 1,500 at 17:05 and about 5,000 across Wales at 17:08, while councils, a fire and rescue service and Natural Resources Wales phoned in to report sites down.

    Trigger

    At 16:30 a route map change was applied, outside formal change control, on a PSBA core Provider Edge (PE) router to leak MPLS VPN routes, so that legacy Capita-operated UPS devices in a /16 subnet could be managed by BT/PSBA. The change was removed at 16:40.

    Root cause
    Component
    Contributing factor
    Detection

    At 16:57 Mid Wales Fire & Rescue Service phoned in a loss of connectivity at its Presteigne site, and at 16:58 a case was opened in Service Now for a group of about 400 alerts and a Major Incident was declared.

    Remediation
    • Removed the route map change from the PE router at 16:40
    • Changed QoS on the BGP to bring back the management links, after which alarms cleared
    • Cleared routes and reset inbound BGP advertisements, which did not stop the default route being advertised
    • Corrected the configuration issue affecting the internet learned route at 01:02
    • Performed a controlled reload of the affected router at 01:10, which restored customer services and management connectivity
    Action items
    • Reinforce change control requirements with an internal briefing on formal change submission, the risks of unplanned changes and roles during planned and emergency changes
    • Create a dedicated Microsoft Teams channel as the single real-time communication point for all live P1 and Major Incidents
    • Explore disaster recovery and business continuity test exercises for major or P1 incidents
    • During loss of management access, have all technical teams assess customer impact from what reporting organisations provide, captured and shared in real time by the Service Desk and Incident Management
    • Investigate a fixed link between Capital Quarter and the PSBA management racks in Vantage Data Centre at Newport, with dedicated management terminals and two-factor authentication for access outside the secure management platform
    • Improve initial triage with stronger probing questions when incidents are reported and keep reassessing and communicating impact throughout the incident
    • Review the P1 and Major Incident process so escalation criteria and timeframes are clearly defined, and train the Service Desk to recognise and escalate them early
    • Review the PSBA estate for legacy configuration, set processes and timeframes for removing it and add controls so it is not introduced again
    • Review email and SMS distribution lists and processes and reinforce Service Desk training on customer communications during P1 and Major Incidents
    Lessons

    The report names eight lessons: a change was made outside PSBA change control; internal communication during the Major Incident was slow and fragmented; the organisation was not ready for a network-wide incident; losing management access stopped the resolver groups from seeing the network state and customer impact; the resolver groups did not understand customer impact in enough detail, which delayed finding the root cause; escalation to PSBA management was slow; legacy configuration left in the network contributed; and email and SMS communications did not reach some customers in time.

  2. Symptoms

    On 12 February 2023, customers in Linode's US-West region could not reach their Linodes. Santa Clara customers lost Internet connectivity after a change made at 8:45 UTC until it was reverted at 10:13 UTC, and later in the day the connection between the Fremont and Santa Clara data centers was cut completely, leaving both with degraded service or a full outage until 16:25 UTC; customers could also have trouble provisioning, powering down or rebooting services.

    Trigger

    A single link of the A-side fibre circuit between Fremont and Santa Clara went down on 11 February, the whole B-side circuit followed on 12 February, and during troubleshooting with the hardware vendor a non-intrusive command triggered a rare bug that took down all A-side links.

    Root cause
    Component
    Contributing factor
    Detection

    The response team began investigating when the A-side link went down on 11 February. The status page opened at 10:22 UTC on 12 February to investigate reports of connectivity issues in the US-West region.

    Remediation
    • Reverted the change that removed internet traffic from the Santa Clara border routers
    • Performed an emergency code upgrade of both circuits, restoring connectivity between the sites
    • Restored the B-side path with the hardware vendor and fiber provider, regaining full redundancy
  3. Symptoms

    On 7 August 2017, while checking the application after the maintenance that moved Mackerel from an on-premises data center to AWS, the team found that data updated during a specific time window was missing. Everything written to the PostgreSQL database between 14:30 and 15:30 JST was gone.

    Trigger

    One hour after the application was switched to the newly promoted primary db001, db001 lost network connectivity and the database failed over to the standby db002.

    Root cause
    Component
    Contributing factor
    Detection

    The team found the missing data while checking how the application behaved after the migration work.

    Remediation
    • Tried to restore the lost updates by hand from the table data left on db001 and gave up
    • Tried point-in-time recovery from the base backup and WAL and gave up
    • Built a new replica db003 with db002 as primary to restore redundancy
    • Kept db001 in maintenance state for investigation
    • Watched db002 for some time to confirm the problem did not recur, then completed the migration
    Action items
    • Change the PostgreSQL replica creation script to set recovery_target_timeline = 'latest' in recovery.conf by default
    • Add a check to a server configuration test tool such as Serverspec that recovery.conf contains recovery_target_timeline = 'latest'
    Lessons

    A setting needed only for a rare layout, such as a grandchild replica during a migration, was applied by hand through a script option and was forgotten. Because recovery_target_timeline = 'latest' is harmless on ordinary standbys too, Hatena now sets it by default whenever a replica is created. The staging rehearsal used the same layout and steps but had the setting right, so it could not catch the mistake. Hatena notes that a similar layout may be used again for a future PostgreSQL upgrade or a move to another region.

Check your cluster for this