IL-0225An IGP purge command made every Microsoft WAN router recompute routes, causing global latency, timeouts and packet lossMicrosoft Azure2023- Symptoms
From 07:08 UTC on 25 January 2023, customers saw long network latency and timeouts when connecting to resources in Azure regions and to other Microsoft services such as Microsoft 365 and Power Platform. Microsoft's monitoring detected DNS and WAN issues from 07:11 UTC.
- Trigger
A network engineer adding capacity to the global WAN in Madrid ran a step of a recently changed standard operating procedure that purged the IGP database; on the router manufacturer involved, that command runs on all IGP-joined routers instead of only the local one.
- Root cause
- Component
- Contributing factor
- Detection
Monitoring detected DNS and WAN issues from 07:11 UTC and alerted the on-call engineers within 5 minutes of the command being run. The team reviewed all recent changes and identified the command by 08:20 UTC. The engineer making the change was not informed of the alerts because of the unqualified changes to the SOP.
- Remediation
- Restarted by hand the paused WAN health and traffic engineering systems, which ended the remaining packet loss
- Action items
- Audit and block similar widespread-impact commands across all three vendors for all WAN router roles
- Give on-call engineers real-time visibility of approved and unqualified activity on network devices
- Run regular mandatory operational training and attestation of following all SOPs
- Have the Change Advisory Board review all SOPs still pending qualification within 30 days
IL-0228IPv4 routing across OVHcloud's global network broke after a router change put the full internet routing table into OSPFOVHcloud2021- Symptoms
At 09:20 CET on 13 October 2021, during a planned change on a router, IPv4 traffic across OVHcloud's whole network stopped being routed, while all IPv6 traffic stayed reachable. The team detected a problem with the router's performance at 09:21 CET and escalated at once.
- Trigger
A planned change to a router in the Vint Hill datacentre in the United States, meant to strengthen anti-DDoS protection, included a command to regulate the redistribution of BGP into OSPF, and the router did not interpret that command correctly.
- Root cause
- Component
- Contributing factor
- Detection
At 09:21 CET the team detected a problem with the router's performance and started the escalation process.
- Remediation
- Disconnected the optical equipment to isolate the router's connectivity
- Powered off the faulty router
- Stabilised connectivity to restore the remaining services
- Action items
- Re-evaluate the change procedure for this type of equipment, which applies the command line natively
- Strengthen the related change process
IL-0222Google Cloud US regions had heavy packet loss and some went unreachable after the network control plane was descheduledGoogle Cloud2019- Symptoms
On Sunday 2 June 2019, with user impact beginning between 11:47 and 11:49 US/Pacific, Google Cloud projects in several US regions saw elevated packet loss from network congestion, and some regions became unreachable. Customers saw higher latency, intermittent errors and lost connectivity to instances in us-central1, us-east1, us-east4, us-west2, northamerica-northeast1 and southamerica-east1, while us-west1, Europe and Asia had no regional congestion.
- Trigger
At 11:45 US/Pacific a relatively rare type of datacenter maintenance event started in one physical location, and the automation that runs it descheduled logical clusters that also held network control plane jobs in other physical locations.
- Root cause
- Component
- Contributing factor
- Detection
Google engineers were alerted to the failure two minutes after it began and started the incident process used for the most serious production incidents. The first customer notice appeared on the status page at 12:53 US/Pacific.
- Remediation
- Lowered the priority of less critical network traffic classes to reduce congestion
- Halted the datacenter automation software responsible for the maintenance event
- Rescheduled the network control plane and its supporting infrastructure in each location
- Rebuilt and redistributed the lost network control plane configuration, rolling it out from 14:03
- Directed service traffic away from the affected regions
- Moved the Cloud VPN control plane in three regions out of its fail-safe state
- Action items
- Keep the maintenance automation off until safeguards stop it descheduling jobs in several physical locations at once
- Harden the cluster management software to reject such requests whatever their origin
- Reconfigure the network control plane to reject maintenance requests of the type involved
- Make the network control plane in each location persist its configuration
- Let the network stay in fail static mode longer when the control plane is lost
- Review, update and test emergency response tooling and procedures, including customer communication tooling, for such network failures
- Extend continuous disaster recovery testing to this and similarly catastrophic failures
These 3 cases involve Backbone network (WAN) and BGP routing. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.
By root cause2
Configuration change2 cases
- Contributing factor
- Organisation
Software defect1 case
- Contributing factor
- Organisation