Cases7 cases

4 to 7 of 7

  1. Symptoms

    From 07:08 UTC on 25 January 2023, customers saw long network latency and timeouts when connecting to resources in Azure regions and to other Microsoft services such as Microsoft 365 and Power Platform. Microsoft's monitoring detected DNS and WAN issues from 07:11 UTC.

    Trigger

    A network engineer adding capacity to the global WAN in Madrid ran a step of a recently changed standard operating procedure that purged the IGP database; on the router manufacturer involved, that command runs on all IGP-joined routers instead of only the local one.

    Root cause
    Component
    Contributing factor
    Detection

    Monitoring detected DNS and WAN issues from 07:11 UTC and alerted the on-call engineers within 5 minutes of the command being run. The team reviewed all recent changes and identified the command by 08:20 UTC. The engineer making the change was not informed of the alerts because of the unqualified changes to the SOP.

    Remediation
    • Restarted by hand the paused WAN health and traffic engineering systems, which ended the remaining packet loss
    Action items
    • Audit and block similar widespread-impact commands across all three vendors for all WAN router roles
    • Give on-call engineers real-time visibility of approved and unqualified activity on network devices
    • Run regular mandatory operational training and attestation of following all SOPs
    • Have the Change Advisory Board review all SOPs still pending qualification within 30 days
  2. Symptoms

    At 11:59AM CDT on Friday 28 August 2020, Basecamp's Ops team received a flood of alerts from PagerDuty, Nagios and Prometheus. Monitoring showed that the newer of the two metro links between the data centers in Ashburn, VA and Chicago, IL had been lost for about 20-30 seconds, and BC3 kept responding slowly after the link came back.

    Trigger

    Both redundant metro links between Basecamp's Ashburn and Chicago data centers dropped for short periods; monitoring showed the newer link down for about 20-30 seconds.

    Root cause
    Component
    Contributing factor
    Detection

    A flood of alerts from PagerDuty, Nagios and Prometheus, with monitoring showing the lost metro link. A lingering alert for one Redis DB instance later pointed to the replication problem.

    Remediation
    • Turned chat off at the load balancer layer so the rest of BC3 could stabilise
    • Restarted Redis on the replica that was stuck in the resynchronization loop
    Action items
    • Make the documented Redis configuration changes for the known replication issue
    • Make concrete plans to remove the shared physical path under the two metro links
    • Prove the failover systems in production at peak load
    • Make explicit room for post-incident follow-up work and push other work out
    Lessons

    Planned redundancy and live testing had given Basecamp a false sense of security, especially at peak load: moving between redundant network links or shifting load across data centers should work without issue, and Basecamp would rather find out in a controlled test with the full team ready. The follow-up from an outage needs urgency and explicitly cleared time, not just a place on a list.

  3. Symptoms

    On Sunday 2 June 2019, with user impact beginning between 11:47 and 11:49 US/Pacific, Google Cloud projects in several US regions saw elevated packet loss from network congestion, and some regions became unreachable. Customers saw higher latency, intermittent errors and lost connectivity to instances in us-central1, us-east1, us-east4, us-west2, northamerica-northeast1 and southamerica-east1, while us-west1, Europe and Asia had no regional congestion.

    Trigger

    At 11:45 US/Pacific a relatively rare type of datacenter maintenance event started in one physical location, and the automation that runs it descheduled logical clusters that also held network control plane jobs in other physical locations.

    Root cause
    Component
    Contributing factor
    Detection

    Google engineers were alerted to the failure two minutes after it began and started the incident process used for the most serious production incidents. The first customer notice appeared on the status page at 12:53 US/Pacific.

    Remediation
    • Lowered the priority of less critical network traffic classes to reduce congestion
    • Halted the datacenter automation software responsible for the maintenance event
    • Rescheduled the network control plane and its supporting infrastructure in each location
    • Rebuilt and redistributed the lost network control plane configuration, rolling it out from 14:03
    • Directed service traffic away from the affected regions
    • Moved the Cloud VPN control plane in three regions out of its fail-safe state
    Action items
    • Keep the maintenance automation off until safeguards stop it descheduling jobs in several physical locations at once
    • Harden the cluster management software to reject such requests whatever their origin
    • Reconfigure the network control plane to reject maintenance requests of the type involved
    • Make the network control plane in each location persist its configuration
    • Let the network stay in fail static mode longer when the control plane is lost
    • Review, update and test emergency response tooling and procedures, including customer communication tooling, for such network failures
    • Extend continuous disaster recovery testing to this and similarly catastrophic failures
  4. Symptoms

    At about 08:49 UTC on 2 June 2019, Packet's internal network monitoring alerted on serious reachability and performance problems in several of Packet's global datacenter locations. The first investigation found routing loops and traffic being blackholed to specific internal and Internet destinations.

    Trigger

    A trans-continental US backbone link in the network of Packet's upstream provider Zayo had a hardware failure and blackholed IP traffic routed over it.

    Root cause
    Component
    Contributing factor
    –
    Detection

    Packet's internal network monitoring alerted at 08:49 UTC on reachability issues in several global datacenter locations, and engineers confirmed them at 08:52.

    Remediation
    • Migrated traffic to an alternative network and removed Zayo from the provider mix
    • Applied route filters to return service to normal
    • Optimised specific routing policies to improve latency across the backbone with the new traffic mix
    Action items
    • Expand internal connectivity monitoring and alerting of on-call operations teams
    • Expand network automation and routing so traffic can be balanced across all available backbone paths and an operator can trigger automated re-routes across all Packet datacenters in a major provider incident
    • Make Packet's provisioning systems less dependent on third party network providers and inter-datacenter connectivity
Check your cluster for this

These 7 cases involve BGP routing and Backbone network (WAN). kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause4

Configuration change2 cases

  1. IL-0394 A Cloudflare router in Miami leaked IPv6 BGP routes to peers and providers for 25 minutes, congesting the backbone
  2. IL-0225 An IGP purge command made every Microsoft WAN router recompute routes, causing global latency, timeouts and packet loss

Capacity exhaustion1 case

Organisation
  1. IL-0341 Traffic between Cloudflare and AWS us-east-1 had high latency, packet loss and origin failures for almost four hours

Software defect2 cases

  1. IL-0342 DigitalOcean's AMS3, LON1 and SFO2 data centers lost Internet connectivity in repeated waves as edge routers failed
  2. IL-0222 Google Cloud US regions had heavy packet loss and some went unreachable after the network control plane was descheduled

Dependency failure2 cases

Organisation
  1. IL-0255 Basecamp's two redundant links between data centers dropped together and a Redis replica resync loop stalled chat
  2. IL-0358 Packet Public Cloud locations had high latency and unreachable paths from routing loops and blackholed traffic
    Packet2019