Applied filters ComponentDatabase replicationFactorChange with a delayed effectClear allEvery case under the filters, with no sentence; newest first.
Suggested filters Search, and the values found in your words appear here.

Graph

  • Root cause
  • Component
  • Symptom
  • Contributing factor
  • Case

Cases2 cases

1 to 2 of 2

  1. Symptoms

    On the event day of a global game, with close to 1000 rps per MySQL instance even after sharding and replication, a master instance stopped because of a host failure. MHA failed over automatically as usual and the service kept running, but one of the three replicas hit a replication error and could no longer follow the latest data.

    Trigger

    Under heavy load on a game event day, a MySQL master instance stopped because of a host failure, and MHA started an automatic failover.

    Root cause
    Component
    Contributing factor
    Remediation
    • Removed the replica that could not apply data from service
    Lessons

    MHA had not followed a mysqlbinlog change in MySQL 5.7.9, so under specific conditions bringing replicas up to date during failover failed. Running MySQL at large scale means meeting rare events like this, which only show when a master stops suddenly under load.

  2. Symptoms

    About an hour after LootLocker cut over from a managed database provider to its own MySQL deployment on 2026-04-28, data anomalies showed up in production. A small window of writes made shortly before the migration, spanning 2026-04-19 to 2026-04-20, had never reached the new database, and the service stayed degraded for about three hours after the cutover.

    Trigger

    On 2026-04-20 at about 16:20 BST, a routine credential rotation, made as part of an unrelated configuration fix, changed the credentials that the temporary replication process used for its database connection, and the process crashed.

    Root cause
    Component
    Contributing factor
    Detection

    Data anomalies were detected in production at about 11:30 BST, about an hour after the cutover.

    Remediation
    • Restored normal service behaviour first and deferred the root cause analysis
    • Requested a restore of the deleted source database from the previous provider
    • Replayed the affected records for impacted users from the restored source database
    Action items
    • Perform technical changes of comparable risk in a scheduled maintenance window instead of as live cutovers
    • Require a pre-cutover checklist that verifies replication or sync processes are live and caught up just before cutover
    • Require an explicit downstream impact review for credential rotations of service accounts used by long-running processes
    • Keep source systems until integrity in the target has been independently verified after cutover
    • Publish planned maintenance and migration notices in the in-product News feed as well as Discord, with clear impact statements and more advance notice
    Lessons

    The failure was a silent side effect of an unrelated change made eight days earlier: the replication process recovered and kept working, so there was no signal that data had been dropped, and a pre-cutover integrity check would have caught it. Deleting the source database before validating the new one made recovery much harder. Choosing a live migration to avoid downtime left no clean point to verify integrity, and the resulting degradation and two days of piecemeal recovery far exceeded what a short planned maintenance window would have cost. The announcement on Discord was not clear enough about the impact and came with too little notice.

Check your cluster for this

These 2 cases involve Database and Database replication. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause2