  1. Symptoms

    Customers using Linode's US-MIA (Miami) and IT-MIL (Milan) data centers saw packet loss and brief performance problems on 14 September 2025 from 17:42 to 18:43 UTC. BR-GRU (Sao Paulo) had the same packet loss on 15 September 2025 from 01:44 to 04:22 UTC.

    Trigger

    A gradual increase in prefixes pushed the routing between the core router and the edge router past the maximum number of permitted prefixes.

    Root cause
    Component
    Contributing factor
    –
    Remediation
    • Raised the prefix limit on all the data center routers
    Action items
    • Raise the thresholds of the sessions between Akamai's backbone and the data center ECOR routers
    • Improve the existing alerting and check its severity before limits are reached, with escalation to the right team for immediate action
  2. Symptoms

    On 10 March 2025 at 16:22 UTC, public internet connectivity in Scaleway's FR-PAR region broke for all products. Most internet traffic between the FR-PAR-2 availability zone and the rest of the PAR region was blackholed for about five minutes, while VPC traffic and Dedibox RPN kept working.

    Trigger

    While Scaleway's network team connected a new data center to the FR-PAR backbone, a human mistake in a router configuration rerouted more than 1 Tbps of traffic between OpCore DC3 and DC5 through a single 100 Gbps link.

    Root cause
    Component
    Contributing factor
    Detection

    The router configuration error was detected quickly and rolled back within four minutes.

    Remediation
    • Rolled back the router configuration, restoring the correct configuration at 16:27 UTC
    Action items
    • Harden the peer review and production communication process for changes
    • Add failsafes and tests before network configuration is applied at backbone level
    • Deploy the fix for the Object Storage synchronisation software issue
  3. Symptoms

    On 12 February 2023, customers in Linode's US-West region could not reach their Linodes. Santa Clara customers lost Internet connectivity after a change made at 8:45 UTC until it was reverted at 10:13 UTC, and later in the day the connection between the Fremont and Santa Clara data centers was cut completely, leaving both with degraded service or a full outage until 16:25 UTC; customers could also have trouble provisioning, powering down or rebooting services.

    Trigger

    A single link of the A-side fibre circuit between Fremont and Santa Clara went down on 11 February, the whole B-side circuit followed on 12 February, and during troubleshooting with the hardware vendor a non-intrusive command triggered a rare bug that took down all A-side links.

    Root cause
    Component
    Contributing factor
    Detection

    The response team began investigating when the A-side link went down on 11 February. The status page opened at 10:22 UTC on 12 February to investigate reports of connectivity issues in the US-West region.

    Remediation
    • Reverted the change that removed internet traffic from the Santa Clara border routers
    • Performed an emergency code upgrade of both circuits, restoring connectivity between the sites
    • Restored the B-side path with the hardware vendor and fiber provider, regaining full redundancy
  4. Symptoms

    From 07:08 UTC on 25 January 2023, customers saw long network latency and timeouts when connecting to resources in Azure regions and to other Microsoft services such as Microsoft 365 and Power Platform. Microsoft's monitoring detected DNS and WAN issues from 07:11 UTC.

    Trigger

    A network engineer adding capacity to the global WAN in Madrid ran a step of a recently changed standard operating procedure that purged the IGP database; on the router manufacturer involved, that command runs on all IGP-joined routers instead of only the local one.

    Root cause
    Component
    Contributing factor
    Detection

    Monitoring detected DNS and WAN issues from 07:11 UTC and alerted the on-call engineers within 5 minutes of the command being run. The team reviewed all recent changes and identified the command by 08:20 UTC. The engineer making the change was not informed of the alerts because of the unqualified changes to the SOP.

    Remediation
    • Restarted by hand the paused WAN health and traffic engineering systems, which ended the remaining packet loss
    Action items
    • Audit and block similar widespread-impact commands across all three vendors for all WAN router roles
    • Give on-call engineers real-time visibility of approved and unqualified activity on network devices
    • Run regular mandatory operational training and attestation of following all SOPs
    • Have the Change Advisory Board review all SOPs still pending qualification within 30 days
  5. Symptoms

    On 10 January 2023 at 16:37 UTC Icinga reported "BGP status on cr3-eqsin is CRITICAL: BGP CRITICAL - AS1299/IPv6: Active - Telia, AS1299/IPv4: Active - Telia", and from 16:45 the hosts in Wikimedia's eqsin site went DOWN with "PING CRITICAL - Packet loss = 100%". Users normally directed to eqsin, mostly in the APAC region, could only read Wikipedia pages already cached in eqsin.

    Trigger

    Planned maintenance by the transport provider took down eqsin's second transport link while the first was still down from a long fiber cut.

    Root cause
    Component
    Contributing factor
    Detection

    Automated monitoring: Icinga BGP status alerts for cr3-eqsin at 16:37 and cr2-eqsin at 16:44, followed by a flood of host-down alerts and three pages at the same time.

    Remediation
    • Depooled eqsin from DNS
    • Repooled eqsin
    Action items
    • Create a backup GRE tunnel for eqsin (T327265)
    • Ensure the long-down transport link comes back up properly once it is fixed (T322529)
    • Automatically parse maintenance notifications and alert on conflicting maintenance (T230835)
    Lessons

    The site was depooled quickly, and "depool first, investigate later" was the right attitude. A flood of host-down alerts usually means a network problem. eqsin stayed too long on a single working transport link, SREs did not catch that the downtime of the two transport links overlapped, and the provider's planned maintenance was not recorded in a task or reminder.

Check your cluster for this

These 12 cases involve Backbone network (WAN) and BGP routing. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause5

Configuration change3 cases

  1. IL-0394 A Cloudflare router in Miami leaked IPv6 BGP routes to peers and providers for 25 minutes, congesting the backbone
  2. IL-0225 An IGP purge command made every Microsoft WAN router recompute routes, causing global latency, timeouts and packet loss
  3. IL-0228 IPv4 routing across OVHcloud's global network broke after a router change put the full internet routing table into OSPF

Capacity exhaustion1 case

Contributing factor
–
Organisation
  1. IL-0564 Linode's Miami, Milan and Sao Paulo data centers had packet loss as traffic moved onto congested alternate paths
    Linode2025

Operator error2 cases

Organisation
  1. IL-0348 Scaleway's FR-PAR region lost public internet connectivity when one 100 Gbps backbone link was saturated
  2. IL-0221 A backbone maintenance command disconnected all Facebook data centers, and its DNS servers withdrew their BGP routes
    Meta2021

Software defect3 cases

  1. IL-0344 Linode's US-West data centers in Fremont and Santa Clara lost connectivity as the fibre circuits between them failed
    Linode2023
  2. IL-0256 Basecamp was fully down twice in two days as hardware load balancers crashed and routers lost sync after failover
  3. IL-0222 Google Cloud US regions had heavy packet loss and some went unreachable after the network control plane was descheduled

Dependency failure3 cases

  1. IL-0267 Wikimedia's eqsin cache site went unreachable when both of its transport links to the core data centers were down
  2. IL-0255 Basecamp's two redundant links between data centers dropped together and a Redis replica resync loop stalled chat
  3. IL-0358 Packet Public Cloud locations had high latency and unreachable paths from routing loops and blackholed traffic
    Packet2019