  1. Symptoms

    On 25 March 2026 from about 16:40, public sector organisations on the PSBA network across Wales lost connectivity at their sites. The Service Desk saw about 400 alerts at 16:58, when a Major Incident was declared, about 1,500 at 17:05 and about 5,000 across Wales at 17:08, while councils, a fire and rescue service and Natural Resources Wales phoned in to report sites down.

    Trigger

    At 16:30 a route map change was applied, outside formal change control, on a PSBA core Provider Edge (PE) router to leak MPLS VPN routes, so that legacy Capita-operated UPS devices in a /16 subnet could be managed by BT/PSBA. The change was removed at 16:40.

    Root cause
    Component
    Contributing factor
    Detection

    At 16:57 Mid Wales Fire & Rescue Service phoned in a loss of connectivity at its Presteigne site, and at 16:58 a case was opened in Service Now for a group of about 400 alerts and a Major Incident was declared.

    Remediation
    • Removed the route map change from the PE router at 16:40
    • Changed QoS on the BGP to bring back the management links, after which alarms cleared
    • Cleared routes and reset inbound BGP advertisements, which did not stop the default route being advertised
    • Corrected the configuration issue affecting the internet learned route at 01:02
    • Performed a controlled reload of the affected router at 01:10, which restored customer services and management connectivity
    Action items
    • Reinforce change control requirements with an internal briefing on formal change submission, the risks of unplanned changes and roles during planned and emergency changes
    • Create a dedicated Microsoft Teams channel as the single real-time communication point for all live P1 and Major Incidents
    • Explore disaster recovery and business continuity test exercises for major or P1 incidents
    • During loss of management access, have all technical teams assess customer impact from what reporting organisations provide, captured and shared in real time by the Service Desk and Incident Management
    • Investigate a fixed link between Capital Quarter and the PSBA management racks in Vantage Data Centre at Newport, with dedicated management terminals and two-factor authentication for access outside the secure management platform
    • Improve initial triage with stronger probing questions when incidents are reported and keep reassessing and communicating impact throughout the incident
    • Review the P1 and Major Incident process so escalation criteria and timeframes are clearly defined, and train the Service Desk to recognise and escalate them early
    • Review the PSBA estate for legacy configuration, set processes and timeframes for removing it and add controls so it is not introduced again
    • Review email and SMS distribution lists and processes and reinforce Service Desk training on customer communications during P1 and Major Incidents
    Lessons

    The report names eight lessons: a change was made outside PSBA change control; internal communication during the Major Incident was slow and fragmented; the organisation was not ready for a network-wide incident; losing management access stopped the resolver groups from seeing the network state and customer impact; the resolver groups did not understand customer impact in enough detail, which delayed finding the root cause; escalation to PSBA management was slow; legacy configuration left in the network contributed; and email and SMS communications did not reach some customers in time.

  2. Symptoms

    On 3 March 2026, during a scheduled maintenance to replace a faulty switch in a cluster in IONOS Cloud's TXL data center, monitoring alerts fired and the hosts in that cluster lost network connectivity. Customers saw intermittent network degradation or outages, and the Data Center Designer (DCD) web frontend and the AI Model Hub became unreachable.

    Trigger

    During a scheduled maintenance to replace a faulty switch, Topology 2 of 2 in the affected cluster was disabled as planned, and a link flap on a switch in Topology 1 then flooded the InfiniBand control plane with alerts and started a fabric resweep.

    Root cause
    Component
    Contributing factor
    Detection

    IONOS began investigating monitoring alerts in TXL; the first status update was posted at 11:36 UTC.

    Remediation
    • Switched from the affected control plane to its standby
    • Rebooted the locked-up gateways
    • Recovered Topology 1 from the scheduled maintenance
    • Paused provisioning in the cluster that had a backlog of queued jobs
    • Re-enabled provisioning once network connectivity improved and watched job execution
    • Re-established connectivity for the systems that support the DCD
    Action items
    • Adjusted the control-plane configuration to use less aggressive failover timers and reduced heavy sweep activity, lowering the load on the forwarding table
    • Reduced the number of multicast group memberships to relieve the forwarding table
    • Set up continuous monitoring of forwarding table use and control-plane memory with alerts before capacity limits are reached
    • Move the control plane to dedicated high-performance servers, separate from data-plane traffic
    • Audit IPv6 configurations and IPoIB driver settings
    • Modernise the interconnect fabric, including switches, gateways and drivers
    • Hardened IAM maintenance protocols so that critical identity services keep working when the primary Cloud APIs are temporarily unavailable
    • Move IAM to a dedicated platform without a dependency on the standard managed Kubernetes clusters
    • Introduce a dedicated provisioning provider for DBaaS and Managed Kubernetes
    • Add automated circuit breakers to the provisioning engine against overload and queue buildup from self-healing services
    • Improve visibility and control over job execution and prioritisation in the provisioning queue
    • Change the provisioning queue architecture to decouple services and reduce spillover
    Lessons

    IONOS identified the linking of services through the shared provisioning queue as a key reason the degradation lasted as long as it did. Alongside making each service more robust, it is decoupling the provisioning queue and addressing dependencies between services to reduce the blast radius of future incidents.

  3. Symptoms

    At about 16:38 UTC on 17 March 2025, internal alerts fired across multiple Linode data centers because various servers had been unreachable for an extended period. At the same time customers began reporting problems with several products.

    Trigger

    A release of Akamai Compute's internal backend API component was rolling out, and during the rollout the API gave inconsistent responses to the route servers.

    Root cause
    Component
    Contributing factor
    Detection

    Internal alerts fired across multiple data centers showing servers unreachable for an extended period, and customers reported problems with multiple products at the same time.

    Remediation
    • Restarted the route servers in all data centers in phases, starting with the most affected regions
    Action items
    • Hold backend API releases until there is a better way to make sure route data for route servers is contiguous
  4. Symptoms

    On 13 March 2025 practically every pod of Nebius Managed Services for Kubernetes in the eu-west1 region lost network connectivity for at least some time between 13:36 and 18:11 UTC. Packets for the affected IP alias routes were not processed by the data plane. The eu-north1 region was not affected.

    Trigger

    A release of a VPC control plane component in eu-west1, deployed to canaries from 13:36 UTC and to all other nodes from 14:35 UTC, changed route distinguisher values for a new feature. The change made a long-standing bug in the handling of route announcements take effect for the update messages of Managed Kubernetes pods.

    Root cause
    Component
    Contributing factor
    Remediation
    • Restarted the host VPC component on the affected nodes one node at a time
    • Restarted the host VPC component on the remaining nodes in parallel once the restart was known to fix the problem
    Action items
    • Fix the bug in the VPC host component itself
    • Add an alert on a diverging number of routes
    • Add an alert on the number of drops in the data plane
    • Develop a way to reset endpoints without restarting the host VPC component
    • Move the VPC's persistent e2e test virtual machines to canary hosts
    • Add persistent e2e tests for Managed Services for Kubernetes
    • Run e2e tests more often
    • Add a deployment stage in which non-critical internal services receive updates first
    Lessons

    The failure needed both an existing IP alias at release time and a particular order of node updates, and neither the testing installation nor the canaries met both, so neither caught it. Missing alerts on technical metrics that deviate from normal, here the number of routes and the number of drops, made the response much slower.

  5. Symptoms

    On 18 October 2024, from 7:50 to 8:01 UTC, about 25% of the hypervisors in Scaleway's FR-PAR-1 availability zone lost VPC connectivity with the rest of the region, and products that use VPC failed with them. Public internet connectivity and Elastic Metal VPC connectivity were not affected.

    Trigger

    At 6:20 UTC a Top of Rack switch in FR-PAR-1 had a software crash. One of the two BGP route reflectors for VPC ran on a hypervisor in that rack and was left in an abnormal state.

    Root cause
    Component
    Contributing factor
    Detection

    Health-check monitoring on both route reflectors detected the anomaly, and the Scaleway Customer Excellence and SRE teams detected the customer impact and opened an incident.

    Remediation
    • Fixed both VPC route reflectors by manual action
    Action items
    • Fixed the autohealing mechanism that had failed to fix route reflectors stuck in a stale state; the fix is https://github.com/FRRouting/frr/pull/17163
    • Run different software versions on the route reflectors so a single bug cannot stop several instances
    • Investigate the software issue that left the route reflectors in a stale state
Check your cluster for this

These 16 cases involve BGP routing and Backbone network (WAN). kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause6

Configuration change5 cases

  1. IL-0400 Public sector sites across Wales lost connectivity for over 8 hours as a PE router wrongly advertised a default route
    PSBA2026
  2. IL-0225 An IGP purge command made every Microsoft WAN router recompute routes, causing global latency, timeouts and packet loss
  3. IL-0266 Eqiad routers looped traffic between each other after a BGP MED change and could not reach other sites' public IPs
  4. IL-0539 KT's internet service failed nationwide for about 89 minutes as wrong routes spread from one router in Busan
    KT2021
  5. IL-0228 IPv4 routing across OVHcloud's global network broke after a router change put the full internet routing table into OSPF

Capacity exhaustion1 case

Organisation
  1. IL-0350 Hosts in an IONOS TXL cluster lost connectivity when an InfiniBand fabric resweep failed on a full multicast table

Faulty deployment1 case

Contributing factor
Organisation
  1. IL-0563 Linode servers lost connectivity in all data centers as route servers built incomplete BGP route tables
    Linode2025

Software defect4 cases

  1. IL-0233 A VPC control plane release broke IP alias routes in Nebius eu-west1, and Managed Kubernetes pods lost connectivity
    Nebius2025
  2. IL-0347 About 25% of Scaleway FR-PAR-1 hypervisors lost VPC connectivity when both VPC BGP route reflectors got stuck
  3. IL-0342 DigitalOcean's AMS3, LON1 and SFO2 data centers lost Internet connectivity in repeated waves as edge routers failed
  4. IL-0222 Google Cloud US regions had heavy packet loss and some went unreachable after the network control plane was descheduled

Dependency failure4 cases

  1. IL-0509 SourceHut was down for 170 hours after a DDoS led its upstream network to null-route the PHL datacenter's subnet
  2. IL-0267 Wikimedia's eqsin cache site went unreachable when both of its transport links to the core data centers were down
  3. IL-0358 Packet Public Cloud locations had high latency and unreachable paths from routing loops and blackholed traffic
    Packet2019
  4. IL-0258 FastMail was unreachable for almost two hours when the GRE tunnels carrying its traffic from Level 3 went down

Operator error1 case

Organisation
  1. IL-0221 A backbone maintenance command disconnected all Facebook data centers, and its DNS servers withdrew their BGP routes
    Meta2021