  1. Symptoms

    On Sunday 2 June 2019, with user impact beginning between 11:47 and 11:49 US/Pacific, Google Cloud projects in several US regions saw elevated packet loss from network congestion, and some regions became unreachable. Customers saw higher latency, intermittent errors and lost connectivity to instances in us-central1, us-east1, us-east4, us-west2, northamerica-northeast1 and southamerica-east1, while us-west1, Europe and Asia had no regional congestion.

    Trigger

    At 11:45 US/Pacific a relatively rare type of datacenter maintenance event started in one physical location, and the automation that runs it descheduled logical clusters that also held network control plane jobs in other physical locations.

    Root cause
    Component
    Contributing factor
    Detection

    Google engineers were alerted to the failure two minutes after it began and started the incident process used for the most serious production incidents. The first customer notice appeared on the status page at 12:53 US/Pacific.

    Remediation
    • Lowered the priority of less critical network traffic classes to reduce congestion
    • Halted the datacenter automation software responsible for the maintenance event
    • Rescheduled the network control plane and its supporting infrastructure in each location
    • Rebuilt and redistributed the lost network control plane configuration, rolling it out from 14:03
    • Directed service traffic away from the affected regions
    • Moved the Cloud VPN control plane in three regions out of its fail-safe state
    Action items
    • Keep the maintenance automation off until safeguards stop it descheduling jobs in several physical locations at once
    • Harden the cluster management software to reject such requests whatever their origin
    • Reconfigure the network control plane to reject maintenance requests of the type involved
    • Make the network control plane in each location persist its configuration
    • Let the network stay in fail static mode longer when the control plane is lost
    • Review, update and test emergency response tooling and procedures, including customer communication tooling, for such network failures
    • Extend continuous disaster recovery testing to this and similarly catastrophic failures
  2. Symptoms

    At about 08:49 UTC on 2 June 2019, Packet's internal network monitoring alerted on serious reachability and performance problems in several of Packet's global datacenter locations. The first investigation found routing loops and traffic being blackholed to specific internal and Internet destinations.

    Trigger

    A trans-continental US backbone link in the network of Packet's upstream provider Zayo had a hardware failure and blackholed IP traffic routed over it.

    Root cause
    Component
    Contributing factor
    –
    Detection

    Packet's internal network monitoring alerted at 08:49 UTC on reachability issues in several global datacenter locations, and engineers confirmed them at 08:52.

    Remediation
    • Migrated traffic to an alternative network and removed Zayo from the provider mix
    • Applied route filters to return service to normal
    • Optimised specific routing policies to improve latency across the backbone with the new traffic mix
    Action items
    • Expand internal connectivity monitoring and alerting of on-call operations teams
    • Expand network automation and routing so traffic can be balanced across all available backbone paths and an operator can trigger automated re-routes across all Packet datacenters in a major provider incident
    • Make Packet's provisioning systems less dependent on third party network providers and inter-datacenter connectivity
  3. Symptoms

    On 30 January 2017, Google Compute Engine instances, Cloud VPN tunnels and GCE network load balancers that were created or live migrated between 10:36 and 12:42 PDT could not be reached on their public IP addresses. Resources created earlier, and instances that were not live migrated, kept working.

    Trigger

    A large set of updates was applied to a rarely used load balancing configuration on the shared layer 2 load balancers.

    Root cause
    Component
    Contributing factor
    Remediation
    • Restarted the jobs that program changes into the network load balancers, so the stuck changes were processed as a batch
    • Applied the fix zone by zone between 11:36 and 12:42
    Action items
    • Increase the canary timeout so updates that hit the inefficient code path only slow network changes instead of stopping them
    • Improve the inefficient code path
    • Write new tests that check behaviour on a wider range of configurations
    • Accelerate replacing global propagation of address configuration with decentralized routing
    • Add metrics and alerting that identify this kind of issue sooner
Check your cluster for this

These 12 cases involve Network control plane (SDN) and BGP routing. kubegap audits a Kubernetes cluster for gaps like these, read-only, from Claude Code or Codex; its checks cite public reports like the ones in this library.

By root cause5

Faulty deployment4 cases

  1. IL-0356 Every domain hosted on Railway returned HTTP 404 to new connections for five minutes because route lookups failed
  2. IL-0354 Fly.io private networking (6PN) broke for some machines after edges received gateway /80 routes
    Fly.io2026
  3. IL-0563 Linode servers lost connectivity in all data centers as route servers built incomplete BGP route tables
    Linode2025
  4. IL-0530 Virtual router controllers in us-central1 ran out of memory in a loop, cutting networking for new and migrated VMs

Capacity exhaustion1 case

Organisation
  1. IL-0350 Hosts in an IONOS TXL cluster lost connectivity when an InfiniBand fabric resweep failed on a full multicast table

Software defect5 cases

  1. IL-0233 A VPC control plane release broke IP alias routes in Nebius eu-west1, and Managed Kubernetes pods lost connectivity
    Nebius2025
  2. IL-0347 About 25% of Scaleway FR-PAR-1 hypervisors lost VPC connectivity when both VPC BGP route reflectors got stuck
  3. IL-0529 New Google Cloud VMs and other instances came up without network connectivity in all zones after VPC controllers stopped
  4. IL-0222 Google Cloud US regions had heavy packet loss and some went unreachable after the network control plane was descheduled
  5. IL-0396 New or live-migrated GCE instances, VPN tunnels and network load balancers were unreachable on public IPs for over 2h

Configuration change1 case

Organisation
  1. IL-0339 Azure Front Door and Azure CDN users saw intermittent connection errors, timeouts and latency spikes for hours

Dependency failure1 case

Contributing factor
–
Organisation
  1. IL-0358 Packet Public Cloud locations had high latency and unreachable paths from routing loops and blackholed traffic
    Packet2019